Cookie Img Back to top
Send SMS Send Inquiry
Need help? Call us :
Home » Products » Connecting Elements » High Tensile U Bolts

High Tensile U Bolts

High Tensile U Bolts
High Tensile U Bolts
Send Inquiry
Product Code : UB-02
Brand Name : AAA SUPPORTS
Price And Quantity
  • Minimum Order Quantity
  • 01
  • Unit of Measure
  • Piece/Pieces
Product Description

To establish a prominent presence in the market, we are engaged in manufacturing and exporting High Tensile U Bolts. These bolts are manufactured under the firm guidance of expert supervisors using high quality carbon steel. These bolts are used in metallurgical and civil engineering works. Available in different sizes and finishing, these High Tensile U Bolts are highly demanded in the market. We offer these bolts at affordable prices to clients.

Features:

  • Light in weight
  • High tensile strength
  • Resistant to corrosion

High Tensile U Bolts

Being a quality conscious organization, we are highly engaged in offering High Tensile U Bolts that is used in various engineering works. Designed and manufactured by our experts in conformity with international standards using premium quality rae materials and latest technology, the offered product is available in various specifications as per the diverse requirements of clients. This High Tensile Square U Bolts is broadly demanded in the industry and is highly appreciated for high tensile strength, durable finish standards, fine finish and cost effectiveness.

Specifications:

NO.

PRODUCT

MATERIAL SPECIFICATION

01

 U- BOLT

CARBON STEEL TO IS 2062 GR A/B. UPTO TEMPERATURE 350°C. ALLOY STEEL TO 1.0% CR, 0.5% Mo (ASTM A 182) & ASTM A 387 GR.11/12 CL.2 UPTO TEMPERATURE 401C TO 530°C. ASTM A 387 GR 22 CL-2 OR ALLOY STEEL 2.0 % CR. 1.0% MO (ASTM A 182). UPTO TEMP 531°C TO 600°C. STAINLESS STEEL AISI 304 / 316/ 321 ABOVE TEMP 530°C. OR AS PER PIPE MATERIALS.

02

BOLT / STUD & NUT.

CARBON STEEL TO IS 1363 / 67 CL-4.6 / 4.0 UPTO TEMP 340°C. ALLOY STEEL TO A 193 GR. B7/A194 GR. 2 H UPTO TEMP 470°C. ALLOY STEEL TO A 193 B16/A194 GR.4 UPTO TEMP 550°C. STAINLESS STEEL TO A 193 B8 / A194 GR 8 ABOVE TEMP 550°C.




 03

SURFACE PREPARATION

BODY OF THE SUPPORTS & ALL ALLIED COMPONENTS ARE CLEANED BY S& BLAST, S&ERS WHEEL (ANGLE GRINDING), EMERCY CLOTH APPLICATION ETC. (TO REMOVE ALL DIRTS FROM THE SURFACE). SPRINGS ARE CLEANED BY SHORT PINNED PROCESS

04

PAINTING

OUR ST&ARD
CLIENT REQUEST

 

TWO COATS OF ZINC CHROMATE RED / GREY OXIDE PRIMER IS: 2074 & ONE COAT OF FINISH ENAMEL PAINT  TO IS-5: 1973 (ALUMINIUM / HAMMERTON GREEN).

HOT DEEP GALVANISED, ZINC PLATED, ZINC PHOSPHATE PRIMER, ZINC SILICATE PRIMER, CORROSION RESISTANT PAINT FURNISH TO CUSTOMER SPECIFICATION.

Trade Information
  • Payment Terms
  • Cash Advance (CA), Cash in Advance (CID), Others
  • Delivery Time
  • 1 Week
  • Packaging Details
  • Wooden boxes
  • Main Export Market(s)
  • Asia, Australia, Central America, North America, South America, Eastern Europe, Western Europe, Middle East, Africa

AAA SUPPORTS PVT. LTD.
X